人生大不同

 找回密码
 立即注册

扫一扫,访问微社区

搜索
热搜: 活动 交友 discuz
查看: 2839|回复: 0
打印 上一主题 下一主题

Cheap Jerseys Outlet Christianburg

[复制链接]
  • TA的每日心情
    无聊
    2018-8-4 00:28
  • 签到天数: 260 天

    [LV.8]以坛为家I

    906

    主题

    912

    帖子

    7834

    积分

    论坛元老

    Rank: 8Rank: 8

    积分
    7834
    跳转到指定楼层
    楼主
    发表于 2018-5-26 19:57:44 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
    B and J Civil Works on Monday resumed work on Burnham Drive in the vicinity of D’Anjou Alley, after an almost three-week cessation,Cheap Authentic Jerseys, due to the presence of exposed cables belonging to the Guyana Telephone and Telegraph Company (GT&T).B and J Civil works was contracted to repair and replace culverts at D’Anjou Alley, Christianburg, Poker Street,Wholesale NFL Jerseys,(Water Lily Road) Wismar and Cooperative Crescent on Mackenzie.According to reports, the rehabilitative work which involves the replacement of the culvert leading into the nearby Demerara River, was halted after the cables became exposed during the initial excavation works.Foreman of B and J Civil Works, Leon Seunarine, said that his company had taken a decision to halt the project until GT&T did what was necessary to protect their cables.In the interim,Wholesale NHL Jerseys, Seunarine and his team had proceeded to Coop Crescent on the opposite Mackenzie shore where similar work was undertaken.However,Cheap Jerseys, contrary to reports in another section of the press, those works were not carried out simultaneously with the D’Anjou Alley works. They commenced after the latter works were suspended pending the intervention of GT&T which had to ensure that its cables were properly protected from any possible damage by the heavy machinery.The GT&T cables were slightly suspended and encased in protective PVC pipes, by personnel from that company.Seunarine said that the D’Anjou Alley project is likely to be completed in a couple of weeks, after which he and his workers will return to Coop Crescent and Poker Street to complete works at those locations.Seunarine pointed out that even though the culverts have been installed at the two locations, the replaced earth has to be compacted before any resurfacing of the roads can commence. Traffic on Coop Crescent has meanwhile returned to normalcy.The culvert replacement projects were made possible through two contracts which were awarded to replace and repair the old systems, and cover the cost of drainage maintenance on both banks of the river.Amounting to $78.1 million,Jerseys NFL Wholesale, these works are expected to alleviate flooding and further erosion, in these areas. Wismar, which is particularly hilly,Cheap Authentic Jerseys, has been battling both erosion and flooding for many years now. When it rains the sand is washed from the hills and silts up the drains, effectively clogging them, with the resultant flooding of low-lying properties downhill.This situation worsened over the years when persons cleared the vegetation along the hillsides to erect homes.Warnings by the relevant authorities to desist from this practice have fallen on deaf ears.The replacing of the three main culverts at D’Anjou Alley, Christianburg, and Water Lilly Road and Coop Crescent at Mackenzie, is the answer to many a prayer according to residents.Some $36.7 million was awarded by the Ministry of Finance to facilitate the projects earlier this year.(Enid Joaquin)
    分享到:  微信微信
    收藏收藏
    Wholesale Jerseys China[url=http://www.wholesalechinanfljerseys.org/]Cheap Jerseys Free Shipping
    回复

    使用道具 举报

    您需要登录后才可以回帖 登录 | 立即注册

    本版积分规则

    手机版|人生大不同  

    GMT+8, 2024-11-1 12:41 , Processed in 0.069832 second(s), 27 queries .

    Powered by Discuz! X3.2

    © 2001-2013 Comsenz Inc.

    快速回复 返回顶部 返回列表